Suspended Ceiling Grid Layout Calculator
These are estimates only.
Suspended ceiling grid layout calculator. Mf ceiling material calculator. We are open and we are staying safe. Ceilume s calculator makes it easy to figure out how many tiles you ll need for your ceiling or wall and shows you how it will look when you re done. Required data entry room width feet room length feet distance from anchor to ceiling support.
The calculation of material needed is based on measurements but the actual amounts needed could be slightly different depending on how you lay out the grid. Enter your tile item armstrong or other and the tool will find a match if it s. Use the drop ceiling calculator to help lay out a 24 x 24 and 24 x 48 ceiling. Suspended ceiling fitting guide.
Estimate the amount of materials you need for your dropped suspended ceiling. Drop ceiling calculator and layout tool. A little time spent planning out your suspended ceiling grid layout will really help you as a installation blu print and in ordering material. 30 per box for 8 top hangers 24 per box for 8 wall mold 60 per box of 2 cross t s.
There are really four main parts to a suspended ceiling. Stud and track material calculator. 30 per box for 8 mains 30 per box for 8 wall mold 60 per box of 2 cross t s. Rp surface mount grid.
Tell us your room dimensions and joist direction and we ll tell you how to lay out your 24 x 24 or 24 x 48 drop ceiling grid and provide an accurate materials estimate for your space. 30 per box for 8 mains. Quite often you are not able to use full lengths. Judge ceiling systems history the early years.
This estimate doesn t include an allowance for waste. It s based on the manufacturer s recommended installation practices. Suspended ceiling layout planner. Dry lining material calculator.
Then get an estimate of materials needed for your project. Start with the length of the room and take the total dimension and deduct as many 2 ceiling tiles as you can without going over the total amount of the room. The length of each support wire should be the distance from the drop ceiling support to the hidden ceiling anchor point plus 9 inches extra on each end to tie. Rp does not have a 4 cross t just 2.
Learn more about our covid 19 response.