Roofing Steps Installation
The following 8 instruction steps will guide you through the installation of a metal roof.
Roofing steps installation. There are two simple rules to follow. Nail metal flashing called drip edge along the bottom edge of the roof deck near the gutters. Start by laying asphalt felt or other underlayment over the roof. 4 preparing the roof surface for shingles drip edge installation after wood decking is prepared we install drip edge at all edges of the roof.
Install shingles from the lower left corner working to the right and also working up the roof slope. Imbed each step flashing in a 75 mm 3 wide application of asphaltic plastic cement and nail in place. Install a drip edge around the perimeter of the roof. Then pull off the.
Stick on the underlayment. In order to accomplish this staggering of gaps cut. Metal step flashing pieces. This aluminum flashing protects the edges of the roof sheathing from water.
Measure the roof area you will need to order enough metal material to cover the entire roof and this process starts with measuring the full size of your roof in square feet. Lay the starter row of metal shingles at the drip edge and affix to the roof with metal roofing nails. Drip edge is a. Work up from the initial row starting at the lower corner in a diagonal pattern staggering the shingles to prevent gaps.
Using your staple gun secure the felt to the roof. Project step by step 15 roll out the self stick underlayment. Protect the roof against ice dams and windblown rain with self stick ice and water. These pieces act as a weather proofing and protective barrier between your house and the elements helping keep water and cold temperatures out.
Cut the sections of flashing with tin snips as needed and nail. Install the starter strip which is just a backing for the first visible row of shingles. Ice and water shield installation next step is installing ice and water shield which is a special type of roofing. Most metal shingles will be attached to the roof using metal shingle.
It stops water from getting. Peel off the bottom backing. Overlap each row at least 3 to 4 inches. Use sticky back ice and water shield as underlayment where ice dams or leaf and twig dams are likely to build up and at.