2 columns 1 to 5.
Roof slab reinforcement calculation. I have given an example for the calculation of the quantity steel rod in slab below. Lineal feet of rebar plus the amount of waste. Before calculating the quantity of steel in one way slab it is very important to clear the basic concepts. Outside of the u s a degree angle is typically used.
The amount of result 3 divided by 20. Main bar distribution bar difference top and bottom clear cover is 25 mm consider development length as 40 d thickness of slab 150 mm. Amount of rebar needed in lineal feet. Department of civil engineering n w f p uet peshawar design of reinforced concrete components of a house.
Technically in the slab we give two different names of these bars main and distribution bar. Calculate optimal rebar spacing and weight for concrete slabs. Steps to calculate the reinforcement required for slab deduct the cover for finding length of bar. The bars we use in the tension zone of the slab is called bent up bars.
This is needed to determine both the lengths of the rebar and how many rows and columns are needed. In the united states a run of 12 inches 1 foot is used and pitch is measured as the rise of the roof over 12 inches. 3 foundation 0 5 to 0 8. Of bars compute the total wt of steel required for slab reinforcement.
The one way slab is supported on two beams and then to the columns of the building. 4 roof slab 0 7 to 0 8. The amount the waste factor will add in lineal feet. Subtract the clearance from the length and width to find the dimensions of the grid.
Main bars are 12 mm in diameter 150 mm centre to centre spacing distribution bars are 8 mm in diameter 150 mm centre to centre spacing. Lb la 16 12 1 33 2 two way slab minimum depth of two way slab is given by formula hmin perimeter 180 2 16 12 12 180 3 73 in assume h 5. The one way slab steel quantity calculation is done according to its supporting conditions. Calculation of steel bars in beams.
Qaisar ali http www eec edu pk page 5 of 24. Evaluate the length of the distribution bar calculate the value of d depth of slab top cover bottom cover find out the no. For instance a 7 12 roof pitch means that the roof rises 7 inches for every 12 horizontal inches. For example if the slab is 10 x 10 and the clearance is 3 the size of the rebar grid will be 9 6 x 9 6.