Roof Rake Instructions
Click on the link below to get detailed assembly instructions for your garant tool.
Roof rake instructions. Telescoping snow roof rake. To prevent penetration of water insects and debris at the ridge outside closures are inserted between the ridge cap and the top end of the panel. Use larger rake boards such as 1 by 4 inch and 1 by 6 inch when there isn t an eave overhang on the gable end. One by 2 inch rake boards often cover the exposed top edge of the siding when there also is an eave overhang on the gable end.
Ridge caps should be installed so that all end laps are away from the prevailing wind. As you can see below just use a simple lateral move to position the roof razor roof rake then an easy push and watch the snow come down. Every 5 inches make a new mark until you get to the rop of the roof. Find assembly instructions for your garant product.
Shingle saver snow roof rake pk90471 sled style gauge rake pk90453 smoother pk90283 snow roof rake 3 handles pk90026 snow roof rake 4 handles pk90228 spiked roller pk90115 stainless steel scraper pk90284 structron sta lok repair kit str 662 topping underlayment squeegee pk90434 tree pruner with interchangeable saw. Allow extra material for rake and sloped side details and trim to exact length during application. Total control 6 cubic foot poly wheelbarrow with total control handles. Choose the product below to download a printable copy of your instructions.
Assembly instructions titan and dynamo roof razor two 7 16 wrenches are required to secure slotted pole to the head frame. Unroll and cut the roof fast 95 base to the appropriate length. So you accidentally threw out the product assembly instructions. Align the center bend of the ridge cap directly over the center line of the roof ridge.
Use your chalk and tape measure to mark about 12 inches up on the roof for the first set of shingles. This is our dynamo model removing wet heavy snow about 6 deep. Continue to chalk additional guidelines based on the width of the shingle through at least four courses rows across the roof. Iko recommends that the remainder of the width used to create the starter strip be used for the first run of roof fast 95 base.
Assemble so that trailing edge of the slide is closest to the long end of the pole and that the single hole is opposite the wheels of the head frame. Tape and to fasten the rake every 6 to 12 up the slope of the roof with the appropriate screws. Place wheels on bottom portion of roof and push upwards. Repeat this on both sides of the roof.
Roof rake boards are installed in different widths based on the surface being covered.