Roof Framing Checklist
Get fix for any cut damaged joist or truss from joist or truss company.
Roof framing checklist. Roof sheathing is nailed every 6 in. The fields in the template include equipment standards of workers. Determine if continuous headers are toe nailed to studs with 4 8d nails. Determine how many rafters you ll need for the roof.
The american plywood association says there s no reduction in strength for nails overdriven by 1 16in. Building is safe and accessible. Roof framing inspection checklist 1. Job address is posted in a visible location per irc section r319 1.
Roof must be complete before framing inspection. R802 3 notches on the ends of rafters don t exceed the nominal joist depth. R802 3 the rafters are framed opposite each other at the ridges. Wall framing inspection checklist continued m.
Roof the ridges hips and valleys have shall be designed as beams for roof slopes 3 ft. 1 roof constructed in accordance with approved layout. In high wind areas sheathing along the eaves rakes and ridges is nailed every 6 in. Add studs under all double girder truss double joist.
Toe nail rim board to sill plate at 6 on center. Approved documents which show. Determine if studs are toe nailed to sole plates with at least 3 8d or 2 16d nails. For most load bearing requirements a roof truss will need to be placed every two feet along the walls.
Daily safety inspection report sample is an audit report which is obviously crucial for any company to track the health and well being of the employees. Along the edges and every 12 in. Depending on how wide the home is you can divide the total length in feet by two to determine how many trusses will be needed. For all new construction.
Layout plans truss members connection schedule permanent bracing details dormers roof structures on manufacturer s drawings equipment appliances on man ufacturer s drawings location as per layout alignment bearing spacing connections to bearing points. Inspect rafter materials and allowable spans r 802 1 r 802 5 tables r 802 5 1 1 r 802 5 1 8 a. Locate the grade mark on the rafter to determine species and grade. Truss roof framing as per design.