Roof Curb Details
![Lowell S E Studio Stat Page Green Roof Roof Detail Curtain Wall Detail](https://i.pinimg.com/originals/cc/4b/47/cc4b476b9d6f61a9d7cd9e96b332159c.jpg)
Curbs should be a minimum of eight inches above the finished roof and factory insulated to reduce condensation.
Roof curb details. All roof curbs equipment rails pipe and duct mounting pedestals and pipe penetration systems to be specified together bought by one contractor and installed by one contractor. Pressure treated nailers should be provided by the curb manufacturer to receive roofing felts and eliminate noise transfer. The curb can also be mounted on a roof deck. Curbs should be sloped to avert water ponding.
There are many options available to make sure all building requirements are met. If the roof curb will be mounted on a new building it can be assembled at any convenient location and installed as soon as the roof support members are in place. Use tack welding or other suitable fastening method to secure the roof curb in place. Roof curb shall be internally reinforced with angles 48 on center and factory installed wood nailer.
Specifications prefabricated roof curb to be manufactured of prime galvanized steel construction 20 18 16 or 14 gauge as required meeting astm a653 653m with welded corners and with seams joined by continuous water and air tight welds. Free cad detail download of a prefabricated roof curb to be used in your architectural section cad drawings. As a general rule the curb should be placed directly on the roof support members.