Rolled Roofing Installation Instructions
To seal a plumbing vent spread roofing.
Rolled roofing installation instructions. Roll roofing a small flat roof with greg zanis weatherwatch this quality gaf leak barrier helps keep water out of the most vulnerable areas of your roof inc. That means 2 inches of rise in 12 inches of horizontal run or steeper. Install peel and stick roofing in a similar manner. It not only protects the roof but it also protects the fascia.
Typical roll roofing installation steps specifications roof slope. Snap a chalk line as a guide for the first layer roofing. 2 like any other roof project you should start this one by addressing the valleys. Cut the rolled roofing.
Attach it to the valley with roofing nails spaced 6 inches apart about 3 4 inch from the edge. It has a life expectancy of anywhere from six to 10 years but it s fairly inexpensive. Roll roofing is a good choice for covering an existing roof. Drip edge or drip cap is either plastic or sheet metal.
How to do it attach first course. Cut the sections of flashing with tin snips as needed and nail. Using a measuring tape measure 35 inches 89 cm up from. This aluminum flashing protects the edges of the roof sheathing from water.
Do not install roll. The roll roofing should be clean and dry when it s installed. Don t install roll roofing whose. Apply asphalt plastic cement evenly over the entire area between chalk lines from one side of the joint to the other.
Installing the rolled roofing 1. To guide the installation snap a chalk line 5 from and parallel to the joint on both sides. Mark a chalk line to identify the end of your first layer. Use a trowel to scoop up the roofing cement.
Roll roofing is a lightweight roofing material that s sold in a large roll. Install a drip edge around the perimeter of the roof. Plan so that no two butt joints are closer than 2 feet from each other. 10 easy steps for diy rolled roofing installation 1 spend some time cleaning the roof before beginning a rolled roofing installation project.
Position the first course so it overhangs the drip edges by about 1 4 inch and roll it out a. It can be installed simply and requires only nails and roofing cement. Apply roofing cement to the roof. Install roll roofing when the temperature is at least 50 degrees fahrenheit to keep the material from cracking.
3 take a roll of 18 inch wide roofing and use it to cover the length of the valley.